Proof of Done

Reference

The rules of proof, the checks, the done gate, the settings and the limits, as the app applies them.

The rules of proof

A criterion is proven when one piece of evidence for it has passed the app’s checks and has been accepted. These rules say who can accept what, as the app applies them.

Who can review

Evidence you entered yourself

Attestations

Self-review

Changing a contract

Evidence and its checks

The app checks the fields of each piece of evidence when it arrives. It does not open the link or run anything. The Review evidence dialog says so too: “These only show the evidence is well-formed. Whether it proves the criterion is your call.”

Every piece of evidence needs a sentence of at least 10 characters that says what it shows. A link, when there is one, has to be an http or https address. Each kind has checks of its own.

Test run
Needs the number of tests that passed and the number that failed. It fails the checks when a test failed or when no test passed. A coding agent can also send the exit code of the run, and a code other than 0 fails.
Build
Needs its result, and a link or a commit. It fails when the result is not a pass. From a coding agent the app takes passed, pass, success, successful, succeeded, green and ok as a pass.
Pull request
Needs a link that looks like a pull request, such as https://example.com/shop/pull/482. It fails when the pull request was closed without merging. An open pull request passes, with a note for the reviewer that it is not merged.
Document
Needs its link.
Attestation
Needs only the statement.
Other
Needs a link or an excerpt of output.

When a criterion asks for one kind of evidence, every other kind fails the checks. When the same link is already used for another criterion of the work item, the evidence still passes and the reviewer sees a note.

What happens to evidence that fails depends on where it comes from. The panel checks before it sends, shows the reasons under “This would not count as evidence yet” and stores nothing. A coding agent’s tool call is stored, labelled “Failed checks”, and the answer tells the agent why.

Evidence that passes the checks waits for a review, except an attestation, which the app accepts when it arrives.

What the labels mean

A work item has one of four labels.

A criterion has one of six.

A piece of evidence reads “Failed checks”, “Waiting for a check”, “Accepted”, “Self-reviewed” or “Rejected”.

The panel shows the two newest pieces of evidence of a criterion and keeps the rest behind a button such as “Show 3 older”. History lists the 100 newest entries of what happened to the contract, newest first. Refresh loads the panel again. Both buttons are there once the work item has a contract.

The done gate

The app calls its reaction to a close without proof the done gate. A close is a move of a work item into a done status from a status that is not one. A project admin picks one of three reactions under “When a work item is closed without proof”.

A work item with no contract, or with a contract that has no criteria, passes the gate. A project can change that with “Treat a work item that has no contract as not proven”.

The gate reacts after the close, when Jira tells the app about the change. Atlassian says a change can take up to three minutes to reach an app. The app does not ask again when that message does not arrive. To stop the close before it happens, add the validator to the workflow.

The app keeps a record of what it saw. Each time a work item that the app can read moves into or out of a done status, the app adds an entry to its history, with the account of the person who moved it. It does that for a work item with no contract too, and when the reaction is “Do nothing”. It also adds an entry for each comment or move back of the done gate and for each transition that the validator refused. When a project does not let the app comment, the comment is missing and the entry is still there.

The project page and the meter

Every project has a Proof of Done page in the row of tabs under its name. It has a meter and two tabs of its own. Work under contract lists the work items that have a contract, and Settings holds the settings of the project.

The Proof of Done page of a project. The meter reads Busy, not climbing, with 8 opened, 0 reopened, 1 closed with proof and 1 closed without proof. A notice says that sample data is loaded. A table lists four work items with their status, their proof and what each still needs.
The project page with the sample loaded. The project in the picture also had three other new work items, so the meter shows 8 opened. Open the picture of the project page at full size.

The meter covers the whole project for the last 7, 14 or 30 days. It compares the work items that were closed with every criterion proven against the work items that were opened or reopened.

Climbing
More work items were closed with proof than were opened or reopened.
Busy, not climbing
Something happened, and the closes with proof did not outnumber the new and reopened work. Something happened when a work item was opened, reopened or closed, or when evidence or a verdict arrived.
Stalled
Nothing of that happened in the period.

The meter shows these numbers.

Opened
Work items that were created in the project in the period.
Reopened
Work items that left a done status in the period.
Closed with proof
Work items that are in a done status now, reached it in the period and have every criterion proven.
Closed without proof
Work items that are in a done status now, reached it in the period and have a contract that is not fully proven. The page marks this number “does not count”.
Closed, no contract
The rest of the work items that Jira counts as closed in the period. That is work with no contract, work whose contract has no criteria, and work whose contract is not among the 200 that the page reads. The page shows this number only when it is not zero, and marks it “does not count”.

So a project where only some of the work has a contract reads “Busy, not climbing” until the closes with proof outnumber everything that arrives.

The numbers come from two places. For “Opened” and for the total of closed work the app asks Jira, as you, how many work items were created and how many reached a done status in the period. Jira answers with an approximate count of the work items that you can see, with or without a contract. “Reopened” and the counts of evidence and verdicts under the numbers come from the app’s own history. They cover every work item in the project, also those you cannot see.

The table on the Work under contract tab lists the work items under contract that you can see, ten to a page. Work that was closed without proof comes first, then rejected evidence, then evidence that waits for a check, then criteria with no evidence, and proven work last. The app reads the 200 contracts that changed most recently and no more. The line above the table gives their number, and it includes work items that you cannot see or that were deleted. The two numbers for closed work with a contract are counted from the same 200 contracts, and only from the work items you can see.

A work item that moves to another project stays on the page of the project where its contract was created.

Settings

The settings are on the Settings tab of the project’s Proof of Done page. The same form is on a page named Proof of Done in the project’s own settings. A project admin or a Jira admin can change them, and everyone who can see the project can read them. The app stores a change when you press Save settings.

When a work item is closed without proof
The reaction of the done gate. The default is the comment.
Evidence has to be accepted by someone other than the person who entered it
Ticked by default. Clear it for a team of one. The rules of proof say what changes. After a change the app counts the 60 contracts that changed most recently again and rewrites their search fields. An older contract keeps its old count on the project page and in the search until its next change. The panel and the done gate use the new setting at once.
Treat a work item that has no contract as not proven
Clear by default. When it is ticked, the done gate reacts to the close of a work item that has no contract, and the validator refuses it. Leave it clear while only part of the project uses contracts.
Project rules
A rule is a criterion that goes into each new contract in the project, next to the ones from the description of the work item. A rule can ask for one kind of evidence. It can apply to every work item type or to the types you pick. A contract that a person starts with Start empty gets no rules, and a contract that already exists does not change. The panel of such a work item offers the missing criteria with an Add it or Add them button.

Who can do what

Search fields

The app copies the state of each contract to a work item property named proof-of-done. Jira’s search can read four fields from it.

proofState
proven, partial or unproven. A contract with no criteria reads none.
provenCriteria
The number of proven criteria.
unprovenCriteria
The number of criteria that are not proven.
proofCriteria
The number of criteria in the contract.

The property also holds the number of self-reviewed criteria and the time of the last update. Jira’s search has no field for those two.

The Proof Verifier

The Proof Verifier is a Rovo agent that comes with the app. It reads the evidence that waits on a work item, decides whether each piece proves its criterion, and records a verdict with its reasoning.

The app hands it the criteria, the evidence with the results of the checks, the Teamwork Graph note where there is one, and up to 6,000 characters of the description of the work item. The app gives it no way to open a link.

Its instructions tell it to judge from the record, to treat text inside evidence as material to judge and not as an instruction, and to reject when it is unsure. The app does not enforce these instructions. The Proof Verifier is a language model, so it can still get a verdict wrong.

The app enforces three things about its verdicts. Each verdict needs a reason of at least 10 characters. The evidence must have passed the checks. The person who asks must have permission to edit the work item.

Open it with Ask Proof Verifier in the panel. The button is there when your site has Rovo, you may edit the work item, and evidence waits for a review. You can also pick the agent in Rovo chat and ask, for example, “Review the evidence that waits on ABC-123”.

Rovo shows the verdicts in a card first, each with a checkbox. The agent records them when you press Confirm selected.

After you press Ask Proof Verifier, the panel looks for new verdicts every eight seconds for five minutes, and it stops earlier when nothing waits any more. A review that you start in Rovo chat does not start this. Press Refresh to see its verdicts.

The app itself makes no calls to a language model. The reasoning happens in Rovo and in the coding agent you connect.

The Teamwork Graph check

Evidence for a pull request or a build is a claim by whoever entered it. When a code host or a CI tool is connected to Jira, the Teamwork Graph holds what that tool reported for the work item. The app compares the two and puts a note in the Review evidence dialog. It does this for a pull request or a build that has a link, and it reads the Teamwork Graph as the person who is using the app.

Confirmed
The graph links this pull request, build or deployment to the work item, and it holds no state that contradicts the evidence. That covers a link for which the graph holds no state at all, and an open pull request when the evidence does not claim a merge.
Differs
The graph holds a state that contradicts the evidence. Examples are a pull request that was declined, a pull request that is still open while the evidence says merged, and a build that failed or has not finished.
Not linked
The graph links other pull requests or builds to the work item, and this link is not one of them.
No record
The graph gave the app nothing to compare with. That happens when the graph links nothing of that kind to the work item, which is what to expect when no development tool is connected to Jira. It also happens when the graph left out one of the lists the app asked for, or gave the app only part of one. Atlassian’s documentation says that the graph leaves out data when an admin has not granted one of the app’s Teamwork Graph permissions, and when the person who asks may not see that data.

To see more than “No record”, the site needs a development tool connected, such as GitHub or Bitbucket. Jira links a pull request to a work item when the work item key is in the branch name, the pull request title or a commit message. Add that pull request as evidence on the work item. The note is in the dialog that opens from Review, or from Reject on evidence you entered yourself.

The Teamwork Graph does not always answer. The app waits four seconds for it. After that the dialog says “The Teamwork Graph did not answer. You can judge without it, or ask again.” and has an Ask again button.

The note is advice for the reviewer. It never accepts or rejects, and the done gate does not read it. The Proof Verifier gets the same note with each pull request or build that has a link, when the graph answers. A coding agent gets it in the answer to submit-evidence, when the evidence passed the checks.

The sample data

Load sample data creates five work items in the project, so that you can see every state of the app at once. Only a project admin or a Jira admin can load or remove them. The app creates and deletes them as itself, so that person needs no permission to create or delete work items.

Remove sample data deletes the sample work items and what the app stored for them, together with any subtasks that someone added under them. The app remembers each sample work item by its Jira id and deletes it by that id. It does not look at what the work item holds by then or which project it is in. It deletes no other work item. When Jira will not delete one of them, the page names it, and you delete it in Jira.

Limits

Known limitations

What it stores and what it may do

The privacy policy has the full list of what the app stores, reads and logs.

Uninstall

Do three things before you uninstall the app.

  1. Remove the “Proof of Done is complete” validator from every workflow. A validator that is left behind blocks its transition.
  2. Press Remove sample data on every project where you loaded the sample. The sample work items are real work items, and they stay in Jira when the app is gone. The app’s list of them goes with its storage, so after an uninstall you have to find them yourself. Their summaries start with “Sample:”, and they carry the label proof-of-done-sample unless Jira refused it.
  3. Remove the app’s MCP server from the coding agents that use it. In Claude Code that is claude mcp remove proof-of-done.

Uninstalling removes the app’s storage for your site. Atlassian’s documentation says that Forge hosted storage retains data for 28 days after an uninstall, and that installing the app again does not bring the data back by itself.

What the app wrote into Jira stays there.

Preview features

The workflow validator, the MCP server, the Rovo skills and the Teamwork Graph API were Preview features at Atlassian on 24 November 2026. Atlassian can change them, and the parts of the app that use them would change with them.

Release notes

24 November 2026. First version.